All agents operational
8D & CAPA

Corrective action tracker

27 open corrective actions · 8D reports auto-drafted from confirmed root causes

Remediation & 8D Agent · drafting1 overdue action
Median CAPA cycle
11.4d
vs 34d baseline
Verified this month
22
closed after effectiveness check
Recurrence rate
4.1%
↓ from 5.6%
Auto-drafted 8Ds
18 / 27
agent-drafted then human-verified

Corrective actions

Owners, due dates, and the investigation each belongs to

IDCorrective actionOwnerProgramDueStatusCase
CAPA-1207Update BMS sleep-mode current spec; reflash 1,247 EV-2 packsM. Iyer · Battery EnggEV-22026-07-18verifyingCQ-2044
CAPA-1206Add humidity dwell interlock to Booth A cycleS. Rao · Paint OpsPV-52026-07-09on trackCQ-2038
CAPA-1205Quarantine NovaSeal lot NS-4471; contain 612 VINsP. Nair · SQAPV-52026-07-05at riskCQ-2031
CAPA-1203Firmware rollback for Kiron IVI KE-7789 on assemblyR. Sen · IVIEV-22026-07-12on trackCQ-2025
CAPA-1198Torque re-verification station downstream of T-14K. Bhat · Line EnggEV-22026-06-30overdueCQ-2044
CAPA-1190Brake caliper break-in torque bump (LCV-7)V. Menon · ChassisLCV-72026-06-22closedCQ-2029
CAPA-1187Body weld robot re-teach · cells 2A/3BN. Gupta · Body ShopPV-52026-06-18closedCQ-2014

8D report · CQ-2044

Auto-drafted by Remediation & 8D Agent from the confirmed root cause · reviewed by A. Rao

  1. D1
    Team
    Cross-functional team assembled: Battery Engg (M. Iyer), SQA (P. Nair), Warranty (A. Rao), Voltar Cells liaison (S. Kapoor).
  2. D2
    Problem
    EV-2 vehicles idle 5–7 days show 12V drain requiring jump-start. 1,247 VINs across Pune build weeks W18–W24, exposure $4.82M.
  3. D3
    Containment
    Sleep-mode current cap engaged via OTA on 894 in-service VINs. Field bulletin SB-EV2-081 issued to 214 dealers within 48h.
  4. D4
    Root cause
    BMS wake-latch remains asserted 4.2× spec when HV isolation MOSFET tail-current exceeds 3.1mA — observed on Voltar cells with lot-B interconnect. Confirmed on 214 telematics traces.
  5. D5
    Corrective actions
    BMS firmware 3.1.7 raises isolation threshold and enforces 90s wake-timeout. Voltar interconnect PPAP re-run. See CAPA-1207, CAPA-1198.
  6. D6
    Implementation
    OTA rollout to 1,247 EV-2 VINs staged over 7 days. Manufacturing cut-in from build week W27. PLM change CR-8821 sent to engineering approval.
  7. D7
    Prevent recurrence
    SPC monitor added to intake test for sleep-mode current. Predictive Quality Agent watches drift on every EV-2 pack.
  8. D8
    Team recognition
    Findings and remediation credited to CausalQ Orchestrator, Root-Cause Agent, Warranty & Field Agent and Voltar SQA team.

Effectiveness verification

A CAPA cannot close until recurrence is scanned and monitored

Monitoring window · CAPA-1207Day 6 of 30
OTA reflash
894 / 1,247
Manufacturing cut-in
W27 confirmed
Field recurrence
0 new claims
Recurrence scan
  • No new BAT-DRAIN-12V claims on reflashed VINs (day 6)
  • Sleep-mode current within spec on 894 telemetry traces
  • Predictive Quality Agent watching for early drift signals
Closure gate: CAPA-1207 remains in verifying until the 30-day monitoring window completes and the recurrence scan returns clean. The Governance & Audit Agent will seal the record on closure.